Projects

Installation of a I AM HYDROCam in open water in Bad Vilbel (Germany)

In Bad Vilbel, an I AM HYDROCam was installed in the open waters of the River Nidda. To keep maintenance to a minimum, the camera was equipped with a wiper system. The live feed from the I AM HYDROCam is broadcast in a local café and is also accessible to the public via a QR code. This initiative aims to make the underwater world more accessible and engaging for the general public.

Further references

Our Projects

I AM HYDRO GmbH is an internationally active company.
Since its founding, we have been involved in numerous projects both in Germany and abroad.

Minimum Flow Assessment in Mavrovo National Park, North Macedonia

In Mavrovo National Park in North Macedonia, data were collected to carry out a minimum flow assessment. For this purpose, six gauging stations were installed to record seasonal flow variations in different river sections. In addition, six model reaches were surveyed in detail, providing the basis for the minimum flow assessment and the hydrological evaluation of the watercourses.

Weiterlesen »