Survey of the Neckar near Aistaig

Survey at the Neckar near Aistaig as a data base for a revitalisation project
Survey of the Nister

Survey of the Nister River after Revitalization
Installation of I AM HYDROCams at the Lech

Installation einer HydroCam am Lech zur Überwachung einer Reuse
Camera surveillance of the water levels in Baden-Württemberg

Development of a concept for retrofitting water level measurement points with camera systems.
Sediment sampling and survey of gravel bars along the Danube

Sedimentprobenahme und Drohnenvermessung von sieben Kiesbänken der Donau bei Kelheim
Installation of a Riverwatcher and a I AM HYDROCam at the Mulde in Rochlitz

Installation of Riverwatcher and HydroCam on the Mulde River in Rochlitz, Saxony, to assess the functionality of the fishway.
Project Start: BfG SmartCam

Software development for fully automated fish counting and species recognition at federal waterways using the VAKI Riverwatcher in collaboration with TalTech, Tallinn, Estonia.
Lecture at the University of Stuttgart

Intensive Course: “Limnology and Ecohydraulics – Theory and Application” at the University of Stuttgart (Germany)
Survey of the Schussen

Surveying three sections of the Schussen River as part of a minimum flow investigation.
Installation HydroCam in Bertoldsheim

Installation of a HydroCam at the fishway facility in Bertoldsheim.