Projects
Field study Shohimardon
Field Study to Investigate the Continuity and Minimum Water Release of a Power Plant Construction in Shohimardon (Uzbekistan) as Part of the EU-funded HYDRO4U Project.

Further References
Our Projects
I AM HYDRO GmbH is an internationally active company.
Since its founding, we have been involved in a variety of projects both domestically and abroad.

Drone survey of the shore of Lake Constance
12. June 2025
Drone survey and creation of georeferenced orthomosaics of the Lake Constance shoreline for studies on sediment deposition.

Survey of the river Stillach (Austria)
12. June 2025
Survey of the Stillach River (Austria) using a drone, complemented by a terrestrial survey.

Survey of the River Isar (Austria)
12. June 2025
Survey of the Isar River for the modeling of various flow scenarios