Projects

Survey of the River Isar (Austria)

For a minimum flow study, sections of the Isar River were surveyed using a drone, GPS, total station, and Flowtracker. The drone captured overlapping individual images with RTK precision, which were then processed into georeferenced orthomosaics using the Structure from Motion (SfM) method. SfM was also used to generate terrain points, which were supplemented with data from ground-based surveys. Discharge measurements with the Flowtracker enabled the modeling of various flow scenarios.

Further References

Our Projects

I AM HYDRO GmbH is an internationally active company.
Since its founding, we have been involved in numerous projects both in Germany and abroad.

Minimum Flow Assessment in Mavrovo National Park, North Macedonia

In Mavrovo National Park in North Macedonia, data were collected to carry out a minimum flow assessment. For this purpose, six gauging stations were installed to record seasonal flow variations in different river sections. In addition, six model reaches were surveyed in detail, providing the basis for the minimum flow assessment and the hydrological evaluation of the watercourses.

Weiterlesen »