Installation Riverwatcher in Baldeney
Installation of a Riverwatcher in the fish lift in Baldeney (Essen)
Installation Riverwatcher at the Fermelbach
Installation eines Riverwatcher-Scanners am Fermelbach
Lecture at the University of Stuttgart
Guest Lecture: “Drone-based Water Assessment: Introduction, Fundamentals, and Examples” in the field of Measurements, Monitoring, and Modeling (MMM).
Data collection at the Nister
Data collection from two sections on the Nister as a basis for hydraulic and habitat modeling.
Temporary installation of pressure gauges at the Argen
Examination of minimum water conditions due to water extraction using temporary pressure gauge installations along the Argen.
Surveying the Neckar
Survey of 2 kilometers of the Neckar River for a minimum flow investigation
Installation of Webcams at the Danube Source
Installation of webcams to capture the progress of the Danube headwaters revitalization project.
Drone Footage of Filder Water Supply
Drone footage of facilities within the catchment area of the Filder Water Supply.
Survey of the Neckar River in Tübingen (Germany)
Surveying areas of the Neckar River in Tübingen as a planning foundation for revitalization measures
Elevation survey of the Basin bottom at the weir in Tübingen (Germany)
Location-specific elevation survey of the Tos Basin bottom at the weir in Tübingen as a planning foundation for the East Radbrücke (bike bridge)