Installation of three I AM HYDROCams in Tyrol (Austria)
Installation of I AM HYDROCams at three locations in Tyrol (Austria)
Installation of two I AM HYDROCams at the Enz
Installation zweier HydroCams an der Enz zur Überprüfung der Durchgängigkeit nach dem Umbau von zwei Sohlrampen
Installation HydroCam Gmunden
Installation einer HydroCam in Gmunden an der Traun zur Überwachung einer Wendereuse (der Wasserwirt)
Installation of a I AM HYDROCam at the Lech
Projects Installation of a I AM HYDROCam on the Lech River (Austria) Installation of a I AM HYDROCam on the Lech River in Tyrol (Austria) Additional References Our Projects The I AM HYDRO GmbH is an internationally active company. Since its inception, we have been involved in a multitude of projects both domestically and abroad.
Survey Dürrach in Tyrol (Austria)
Projects Survey of the Dürrach in Tyrol (Austria) Survey, aerial survey, and flow measurements on the Dürrach at the border with Tyrol above the Sylvensteinspeicher reservoir as part of a discharge experiment Additional References Our Projects The I AM HYDRO GmbH is an internationally active company. Since its inception, we have been involved in a […]